our clients
INDITEX, S.A.
- Execution project and construction management engineering works for the provision of facilities to the new office building in Arteixo. (2017). Project developed in BIM.
- Project to reform offices in Centro Logistico (2017). Project developed in BIM
- Project of a gymnasium for Logistic Center in Arteixo (2017). Project developed in BIM
- Study loads of fire and elaboration of the self-protection Plan of the Logistic Center of Arteixo. (2017)
- Project for the reform and expansion of evacuation and public address systems at the Arteixo Logistics Center and the Denllo and Stear factories. Arteixo – A Coruña (500,000 m 2 ) (2016)
- Execution project and construction management of the new stairwells executed on the existing floor at the Logistics Center in Arteixo (2014).
ALUMINIOS CORTIZO, S.A.
- Industrial warehouse project for storage and distribution of aluminum profiles in Granadilla de Abona, Tenerife. (2017)
- Project of two warehouses for workshop use and warehouse of aluminum products in Manzanares, Ciudad Real (2017)
- Project and D.O. of industrial warehouse destined to storage and distribution of aluminum profiles in Burgos. (2014)
- Work direction of industrial warehouse destined to storage and distribution of aluminum profiles in Torrelavega. (2014)
- Basic project, execution and technical management of reform in the main production plant of Aluminios Cortizo in Padrón. (2013-2014)
FINITEC S.L.
- Flexibility Analysis of Exhaust Gas Line for an Incinerator. (2017)
PESA MEDIOAMBIENTE, S.A.
- Structural calculation of the PLISAN AS NEVES WWTP (2017)
- Project and D.O. calculation of sludge heat exchangers of two anaerobic digesters. (2016)
- Steam Line Design and Calculation in Orense WWTP (2016)
- Design and calculation of the heat exchangers of the anaerobic digestion process of the Odarse Edar (2016)
- Calculation and Design of the Dome Cap, Heat insulation of the Virola and Dome and Access Ladders to the Anaerobic Digesters for the treatment of sludge with a diameter of 17 m and with a capacity of 3071 m3 of the Edar de Ourense . (2016)
- Calculation of manholes for Anaerobic Digesters for the treatment of sludge with a diameter of 17 m and with a capacity of 3071 m3 of the WWTP of Ourense. (2016)
INDIPUNT, S.A.
- Project for industrial building and construction management (2017)
- Industrial wash installation reform project (2017)
- Adaptation project industrial warehouse to the activity of warehouse of machinery and textile articles. (2014)
- Dismantling project of existing cogeneration plant (2014)
- Firefighting project that includes evacuation, signaling and public address of the facilities in Narón (2014)