Our clients

our clients

INDITEX, S.A.

  • Execution project and construction management engineering works for the provision of facilities to the new office building in Arteixo. (2017). Project developed in BIM.
  • Project to reform offices in Centro Logistico (2017). Project developed in BIM
  • Project of a gymnasium for Logistic Center in Arteixo (2017). Project developed in BIM
  • Study loads of fire and elaboration of the self-protection Plan of the Logistic Center of Arteixo. (2017)
  • Project for the reform and expansion of evacuation and public address systems at the Arteixo Logistics Center and the Denllo and Stear factories. Arteixo – A Coruña (500,000 m 2 ) (2016)
  • Execution project and construction management of the new stairwells executed on the existing floor at the Logistics Center in Arteixo (2014).

ALUMINIOS CORTIZO, S.A.

  • Industrial warehouse project for storage and distribution of aluminum profiles in Granadilla de Abona, Tenerife. (2017)
  • Project of two warehouses for workshop use and warehouse of aluminum products in Manzanares, Ciudad Real (2017)
  • Project and D.O. of industrial warehouse destined to storage and distribution of aluminum profiles in Burgos. (2014)
  • Work direction of industrial warehouse destined to storage and distribution of aluminum profiles in Torrelavega. (2014)
  • Basic project, execution and technical management of reform in the main production plant of Aluminios Cortizo in Padrón. (2013-2014)

FINITEC S.L.

  • Flexibility Analysis of Exhaust Gas Line for an Incinerator. (2017)

PESA MEDIOAMBIENTE, S.A.

  • Structural calculation of the PLISAN AS NEVES WWTP (2017)
  • Project and D.O. calculation of sludge heat exchangers of two anaerobic digesters. (2016)
  • Steam Line Design and Calculation in Orense WWTP (2016)
  • Design and calculation of the heat exchangers of the anaerobic digestion process of the Odarse Edar (2016)
  • Calculation and Design of the Dome Cap, Heat insulation of the Virola and Dome and Access Ladders to the Anaerobic Digesters for the treatment of sludge with a diameter of 17 m and with a capacity of 3071 m3 of the Edar de Ourense . (2016)
  • Calculation of manholes for Anaerobic Digesters for the treatment of sludge with a diameter of 17 m and with a capacity of 3071 m3 of the WWTP of Ourense. (2016)

INDIPUNT, S.A.

  • Project for industrial building and construction management (2017)
  • Industrial wash installation reform project (2017)
  • Adaptation project industrial warehouse to the activity of warehouse of machinery and textile articles. (2014)
  • Dismantling project of existing cogeneration plant (2014)
  • Firefighting project that includes evacuation, signaling and public address of the facilities in Narón (2014)