our clients
BIOMASS PLANTS AND ORGANIC CYCLES OF RANKINE
VALES CORUÑA. S.L. (Aranga – A Coruña)
- Preliminary project, project and procedures Installation of Cogeneration through Organic Rankine cycle. Biomass boiler. 1 MW Sector: Door manufacturing (2013)
ENERGÍA DE GALICIA, S.A.
- Electricity generation plant project based on primary forest biomass, power 10 MW. (2011)
Sector: Wood.
RESTORATION OF THE HABITAT AND MEDIAMBIENTE CAAMAÑO, S.L. (Villagarcía)
- Draft and licenses of generation plant 700 kW Rankine cycle. (2012)
MONTE ALTO (Palencia)
- Draft, project and processing of a 10 MW biomass plant in Palencia. (2011)
Sector: Energy.
COGENERATION FACILITIES
POLIPROPILENO DE GALICIA, S.A.U. (Narón)
- Project and procedure for the installation of a cogeneration plant of 1,000 kWe (2014)
CONSERVAS CERQUEIRA, S.A. (Vigo)
- Pre-project, project and procedures for 1MW cogeneration plant. (2014)
MONDELEZ ESPAÑA PRODUCTION, S.L.U. – (KRAFT) – (Hospital de Órbigo – León)
- Preliminary project, execution project and procedures for 2MW Cogeneration Plant. Sector: Food (2012)
- Project and D.O. refrigeration installation of production hall. (2014)
FRINOVA (Porriño, Pontevedra)
- Preliminary Draft, Execution project and procedures to change gas to cogeneration plant of 000 kWe (2013)
Sector: Conservero – alimentation.
HERMANOS OBLANCA SL (Onzonilla, León)
- Draft project, execution project and processing of 500 kWe cogeneration plant. (2012)
Sector. Slaughterhouse – feeding.
SOLVIDA SANXENXO, S.L.
- Preliminary Draft, Project for the execution and processing of 1MW cogeneration plant (2012)
- Project and D.O. modificaicón Transformation Center of the Hotel Augusta, new sectional center for service of the cogeneration installation and the Hotel. (2012)
Hotel sector.
JEVASO, S.L.
- Preliminary project, execution project and procedures for a 500 Kw cogeneration plant. (2011)
Setor: Textile – Ironing clothes.
MADERAS ORNANDA SLU (Porto do Son, A Coruña)
- Draft project, execution project and processing of 500 kW cogeneration plant. (2011)
- Installation of C.T. 630 kVA in factory (2011)
Sector: Wood industry.
EMBUTIDOS RODRÍGUEZ, SL (Soto de la Vega, León)
- Preliminary project, execution project and processing of a cogeneration plant of 1000 kW (2011)
- Internal installation legalization G.N. for cogeneration (2012)
- Preliminary draft of the underground medium voltage line (2011)
- Ship boiler room legalization project (2010)
Sector: Food Industry.
CAMPOBRICK, S.L. (Messiah – A Coruña)
- Draft and Project for the execution and processing of Modification and transformation to gas of cogeneration plant of 5×1365 kW.
Sector: Ceramic
MEGASA SIDERÚRGICA, SL
- Development and implementation of an autonomous emergency group of 2,500 kVA: Year.
Sector: Steel products.
TOP WASH, S.L. (Arteixo – A Coruña)
- Preliminary project and execution project and procedures for the modification of the cogeneration plant (500 kW). Year 2009.
Textile sector.
MASSIMO DUTTI (INDITEX Group)
- Study, Development and Implementation of trigeneration plant (Electricity, cold and heat) in Tordera (Barcelona). Installed power 2950 kVA. Year 2006)
ALUMINIOS CORTIZO SA (Padrón, A Coruña)
- Preliminary and feasibility study of modification of gas change of cogeneration plant of 10 MWe.
Sector: Aluminum